Cooper Oates Finds Creative Solution for Unit Replacement

The Problem

In summer of 2021, the building manager of ACE Hardware in Turlock, California became aware of an uncomfortably warm environment inside the store. Worried of losing customers due to the heat, ACE Hardware rented portable cooling units to help their struggling HVAC system- which were very expensive yet not remotely effective enough to serve as a long-term solution for the 40,000 square foot store in the summer. Something else needed to be done.

Added Challenges

Previously for ACE Hardware, finding a mechanical contractor willing and able to take on this job was quite difficult. The project was made particularly challenging because the building was built around the air handler on the structural platform. Other local mechanical contractors had stated that the air handler couldn’t fit through the door openings or the narrow passageway between the mechanical room and warehouse, proving replacement would be no simple process. Therefore, replacing the unit required a creative workaround to the structural constraints.

The Solution

When our Special Projects team went to the site, they came up with a plan to cut the roof open without affecting the roof’s structure for access to remove and replace the 44,000 CFM air handler. Part of our team’s scope was to cut the existing air handler into pieces small enough to fit through the allowable roof, as the opening had to be limited in size to avoid cutting any structural members. The new air handler had to be ordered in sections small enough to fit through the roof’s opening- an uncommon constraint. In addition, Cooper Oates provided structural engineering plan sheet calculations and mechanical engineering to draw M Sheet and title 24 for permit purposes.

External Challenges

Due to supply chain challenges and a very wet winter, we had to wait for equipment arrival and delay opening up the roof until there was a guaranteed week of dry weather. Up until this point and due to the delay, our team continued to service the existing air handler to keep it working well enough to cool the store before the replacement.

Work Performed

Prior to the new air handler arriving on site, our Special crew expanded the structural steel platform where the air handler was to be set, fabricated in-house by our team, and added a new catwalk for future service access. On replacement day, the roof was cut open by a carpenter to allow the air handler sections to fit through.

Next, our team cut the old air handler into sections ready for removal and cleaned up old debris on the platform for a safe working environment. We then facilitated the removal of the old air handler in sections via crane through the roof opening, and proceeded to bring in the new unit afterwards in the same fashion.

Lastly, we replaced the condensing unit located on the ground outside of the building. After setting the units, we reconnected the Carrier iVu controls to the newly installed units and reconnected the electrical to the air handler and condensing unit.

Outcome

The Cooper Oates Special Projects team was successful in solving ACE Hardware’s challenging cooling issue, due to creative thinking and teamwork. Since the new equipment meets 2023 energy standards, ACE Hardware will save money due to decreased energy usage, and have a smaller carbon footprint due to the new unit’s efficiency and positive environmental impact.

Project Details

  • Type:

    HVAC, Special Projects

  • Sector/Industry:

    Commercial/Mixed Use

  • Location:

    Turlock, CA

  • Year Completed:

    2023

Cooper Oates (no AC) white and blue logo

Contact

6250 Sky Creek Drive
Sacramento, CA 95828

 

916-381-4611

 

 

Business Hours

Monday to Friday
7:00 am to 4:00 pm

 

24/7/365 Emergency Service

 

CA Contractors License #: 611351