Hydronic Piping for New Chiller
This project for Sacramento City College included the installation of 6” carbon steel piping on a new Carrier 300-ton chiller.
The piping on the left is chilled water that will get pumped out to several buildings to cool the classrooms. The piping on the right is condensed water, which is used to regulate the temperature of the chiller.
Project Details
Type:
Plumbing, New Installation
Sector/Industry:
Education
Location:
Sacramento, CA
Year Completed:
2024