Sheraton Grand Hotel Bar Relocation & Upgrades
This project involved relocating a hotel bar, leading to expanded capacity and upgraded amenities.
Process
After demolition of the old bar, our team installed underground waste and water including 16 floor sinks, two floor drains, and wo 6” solid core soda lines for running beer to the bar followed by overhead water and vents.
After the bar itself was built out and kitchen equipment was put in place, all supply & drain lines were installed and connected.
Project Details
Type:
Plumbing Construction
Sector/Industry:
Hospitality
Location:
Sacramento, CA
Year Completed:
2026
General Contractor:
Dome Construction